This describes a proposed reference architecture. It is not a shipping product and no vendor partnership is claimed or implied. Interfaces and standards conformance are specification intent; quantities are design targets.
One operator HUD
Plant and compute surface in a single operator picture rather than two consoles staffed by two teams.
One philosophy
Alarm priority and response expectations are consistent across both facilities, which is a prerequisite for a shared rotation.
Shared on-call
A single qualified rotation covers both. That is the actual operating-cost argument for co-location.
Cross-training defined
Required competencies for a combined operator are specified, since this role does not exist in either industry today.
Requires a training and qualification programme for a combined plant/compute operator role. Porritt Inc. training capability is directly applicable.
Discuss the details.
Specifications evolve as the design matures. Contact us for current status and integration requirements.
CONTACT TIMOTHY → Back to Run by Plant Intelligence →