PORRITT•INC
( LAYTON, UT )
PILLAR 03 · PROPOSAL

Run by Plant
Intelligence.

The compute hall is a process facility with unusual tenants. The same supervisory stack that runs the generation runs the hall — one control layer, one HUD, one operations team, plus the full software stack to run the Exascale server.

← Back to HPC Compute

One layer, two facilities
STACK 01

Workload meets plant

Scheduling that knows the plant state can move flexible work to match generation instead of fighting it. That is only possible with one control layer.

1
Control layer
STACK 02

Orchestration included

HPC Compute ships with the software to run the machine: scheduling, orchestration, placement, telemetry, and the supervisory tie-in to generation.

FULL
Software stack
STACK 03

One operations team

Two facilities, one HUD, one alarm philosophy, one on-call rotation. Operating cost is where colocated compute either works or does not.

1
Ops team
1
Control layer
FULL
Software stack
1
Ops team
PROPOSAL
Reference design

Compute is a plant system.

Treat the hall like process equipment and it behaves like process equipment.

CONTACT TIMOTHY → Back to HPC Compute →