The Reactor That Can’t Melt Down Is Already Being Built: X-energy’s Xe-100 and the Race to Power Both AI and Industry

X-energy’s Xe-100 uses TRISO pebble-bed fuel that physically cannot melt down — SiC integrity holds to 1,600°C with no active cooling. 750°C helium outlet serves both electricity (76 MWe/module) and industrial process heat. DOE ARDP backed ($2.5B). Amazon invested $700M. Dow Chemical plant under construction in Seadrift, TX. The only advanced reactor that powers both data centers and refineries from the same platform.

The Reactor That Can’t Melt Down Is Already Being Built: X-energy’s Xe-100 and the Race to Power Both AI and Industry Read More »