What we supervise
CAPABILITY
Capture-train control
Absorber, stripper, reboiler duty, and solvent condition supervised against a host plant whose load is not under your control.
CAPABILITY
Legacy integration
The host predates the capture unit. We tie into what exists rather than requiring the host to be re-instrumented first.
RETROFIT
Integration
CAPABILITY
MRV-ready data
Measurement, reporting, and verification obligations mean the data has to be defensible years later. Provenance is designed in, not reconstructed.
MRV
Audit ready
RETROFIT
Legacy integration
MRV
Audit-ready data
HOST
Load-following
1
Operator HUD
Capture, verifiably.
If the data will not survive an audit, the tonnes do not count. We build for the audit.
CONTACT TIMOTHY → Back to Process Facilities BoP →