This describes a proposed reference architecture. It is not a shipping product and no vendor partnership is claimed or implied. Interfaces and standards conformance are specification intent; quantities are design targets.
Cold plate to node
Heat is removed at the die rather than from room air, which is what permits current and next-generation accelerator density.
Secondary side
Facility water interfaces the technology loop through a CDU. Approach temperature and flow are specified so the hall can accept warmer supply where recovery is intended.
N+1 on rejection
Cooling loss is a fast-consequence failure for dense compute. Rejection capacity is specified with redundancy and a defined ride-through.
Field maintainable
Quick-disconnect and drip-free service are requirements, not conveniences. A hall nobody can maintain safely is a stranded asset.
Coolant chemistry, filtration, and materials compatibility are specified at project level. Warm-water operation trades cooling efficiency for recovery potential and is a per-site decision.
Discuss the details.
Specifications evolve as the design matures. Contact us for current status and integration requirements.
CONTACT TIMOTHY → Back to Server-Class, Vendor-Open →