PILLAR 01 · PROPOSAL

Energy-
adjacent
halls.

AI demand is an energy problem. Siting compute at the generator instead of at the end of a congested interconnect removes the queue, the losses, and most of the schedule risk.

← Back to HPC Compute

Modular data-center hall at night beside a power generation facility
BEHIND THE METER · COMPUTE AT THE GENERATOR
Why site at the source
CASE 01

Skip the interconnect queue

Grid interconnection is now the long pole for large loads. Behind-the-meter siting turns a multi-year queue position into a construction schedule.

0
Queue position
CASE 02

Keep the losses

Transmission losses and wheeling charges disappear when the load is at the fence. That margin funds the compute rather than the utility.

BTM
Behind the meter
CASE 03

Use the heat

A compute hall is a heat source. Colocated with process or generation, that heat has somewhere useful to go instead of into the sky.

REUSE
Thermal path
BTM
Behind the meter
0
Interconnect queue
REUSE
Waste heat
PROPOSAL
Reference design

Put it where the power is.

This is a proposed reference architecture. We are building toward partners who want to site it.