Figures on this page are engineering design targets and reference-architecture values, not measured results from operating hardware. They state what the design is being engineered to achieve. Verified performance data will replace them as systems are built and tested. Nothing here should be relied upon as a performance warranty.
Behind the meter
Co-located with generation. Interconnection queue position is not on the critical path.
Direct liquid cooling
DLC as the primary path, with defined facility-loop interface and N+1 rejection.
Vendor-open
Interfaces, thermals, and power are specified; accelerator selection remains a later procurement decision. No vendor partnership is claimed.
Full stack included
Provisioning, scheduling, orchestration, telemetry, and plant-aware workload placement.
Regulatory citations describe the framework the programme is built against. Applicability depends on the facility, its licence basis, and its jurisdiction — confirm applicable requirements for your site before relying on any mapping.
Request the full brief.
Detailed scope, pricing, and delivery options on request.
CONTACT TIMOTHY → Back to HPC Compute →