How it works
CAPABILITY
Compliance is measured at the fence
Interconnect agreements specify behavior at the point of common coupling. Control has to be authoritative there, not two layers inward.
CAPABILITY
Ramp is a contract term
Response rate and ramp obligations are commercial terms. Missing them is a financial event, not an engineering curiosity.
CAPABILITY
Ride through disturbances
Voltage and frequency excursions on the grid side should not become a plant trip. Ride-through is designed, not hoped for.
PCC
Measured at
RAMP
Contracted
RIDE
Through
COMPLIANT
Interconnect
One operating layer.
This capability is part of the Plant Intelligence stack, not a standalone product.
CONTACT TIMOTHY → Back to Power Generation →